Get Your Estimation & Takeoff Report Started
Submit your details and a Zenith structural engineer will reach out within one business day.
Zenith's ML-powered estimation service delivers accurate cost forecasts before a single shop drawing is issued. We run your structural model through StruxBIM™'s estimation engine — accounting for section weight, connection complexity, regional labor rates, and current market pricing — and return a complete BOM and cost report in hours, not days.
Unlike manual takeoff, our AI scores every connection for fabrication complexity, flags unusual details that drive up cost, and runs change order impact analysis in seconds when scope changes.

Example BOM extract from a single-story industrial frame — anonymized. Your report includes all sections below plus coating surface area, weld lengths, and a cost forecast.
| Member Type | Section | Qty | Avg Length | Total Weight | Unit Cost | Line Total |
|---|---|---|---|---|---|---|
| Column | W12×72 | 8 | 24′-0″ | 11,520 lb | $1.42/lb | $16,358 |
| Roof Beam | W18×35 | 14 | 40′-0″ | 19,600 lb | $1.38/lb | $27,048 |
| Brace | HSS6×6×½ | 6 | 18′-6″ | 3,312 lb | $1.55/lb | $5,134 |
| Base Plate | PL 1″×14″×14″ | 8 | — | 1,120 lb | $2.10/lb | $2,352 |
| Misc Angle | L4×4×⅜ | 22 | 6′-0″ | 1,518 lb | $1.65/lb | $2,505 |
| Total (5 line items shown of 23) | $53,397 | |||||
Full report includes 23 line items, weld schedule, coating SF, labor hours by trade, and cost forecast with ±8% confidence interval.
Submit your details and a Zenith structural engineer will reach out within one business day.